Vertical lift trash gate frame at the tunnel approach
All projects

Irrigation · 2025–26

Vertical lift trash gate at the 7 km Ajjampura tunnel, Upper Bhadra Project

Fabrication and installation of a 3.5 m × 4.5 m vertical lift trash gate with 25 mm MS square mesh at the approach to the 7 km Ajjampura tunnel, including embedded parts, the lift gate and a screw hoist.

3.5 m × 4.5 m gate25 mm MS square meshScrew hoist1,274 anchor rods

₹25.18 L

Incl. GST

Client

Visvesvaraya Jala Nigam Limited · UBP Division No. 3, Ajjampura

Location

Ajjampura, Chikkamagaluru, Karnataka

Completed

2025–26

Quantities

Executed items

ItemQuantityUnit
Vertical lift trash gate3.5 × 4.5m
MS square mesh25mm
Anchor rods1,274nos
Embedded parts, lift gate and screw hoist1set

As stated on the work done certificate issued by the department.